Pipe Bevelling, Flange Facing And Prepping Equipment (RANGE: 1/2″ – 1 1/2″)

The smallest in our range of I/D locking, direct in-line feed end prep machines. The Prep 2 is small, lightweight, yet powerful, in electric (110v or 220v), or pneumatic drive form.

A four jaw chuck allows use of up to four form tools to enable weld preparation of thin wall tube, or heavy wall pipe. Simultaneous external & internal bevelling and flange facing of tubes is simple, idea for accurate repetitive work.

Its size, power, and functionality, make it extremely popular in high volume heat exchanger work, tube facing, weld removal, and J-prepping of the tube plate.

Data Sheet

Category:

Description